Chapter 05 · Professional work

Narsi Group: from one contract to a national fit-out house.

How the firm Narsi Kularia founded in 1986 works, whom it has worked for, and the projects that brought it to public attention.

Narsi & Associates · Narsi Interior Infrastructures Pvt. Ltd. · Narsi Group

The company

One firm, three names

The business Narsi Kularia founded in 1986 as Narsi & Associates operates today as Narsi Group, with Narsi Interior Infrastructures Pvt. Ltd. as its corporate entity. He is described as its Chairman and Managing Director; Jagdish Kularia serves as a director.12

The group presents itself as a one-stop, pan-India turnkey interior fit-out provider — taking a project from design through materials, manufacturing and on-site installation. Its work spans government, corporate, healthcare, banking and educational buildings.3 A 2022 report described the company as equipped with “tech-driven, Industry 4.0 solutions”.4

Its first project, in 1986, was the Lubrizol plant in Navi Mumbai. By 1994 its clients included several of India’s leading financial institutions.15

Scope of services

What the group does

Interior contracting
Turnkey fit-out of offices, public buildings and institutions, from partitions and ceilings to finishes and services coordination.
Furniture manufacturing
In-house production of loose and built-in furniture; the group’s own materials describe its Navi Mumbai facility as India’s largest integrated interior fit-out facility.
Design & build
Single-point responsibility for design development and execution.
Civil works
Large-scale civil projects alongside interiors, as listed in company materials.
Sectors
Government, corporate, healthcare, banking and education.
Material focus
Wood, identified as the group’s preferred material in a case study by Coral, an Italian industrial equipment maker.

Sources: Narsi Group materials; Vishwakarma Shakti Sangh Foundation; Coral case study.356

Clients named in published profiles

Who the group has built for

  • IDBI
  • ICICI
  • State Bank of India
  • Standard Chartered
  • National Stock Exchange
  • Amazon
  • Google
  • Infosys
  • TCS
  • Wipro
  • Reliance Industries
  • Asian Paints
  • Kotak Mahindra Bank
  • UBS
  • ADP
  • John Deere

Names as listed by Sangri Today (2023), the Vishwakarma Shakti Sangh Foundation, and Narsi Group’s own materials. Inclusion reflects those published lists, not a claim about the size or date of any individual engagement.153

Case · Central Vista, New Delhi

The new Parliament of India

12,000

Chairs and tables — the approximate loose-furniture scope reported for Narsi Group in the new Parliament building, alongside its complete interior fit-out.4

Scope
All loose furniture and the entire interior fit-out works
Main contractor
Tata Projects Limited
Architect
HCP (HCP Design, Planning and Management)
Spaces reported
Constitution Hall, members’ lounges, library, café and dining areas, committee rooms, VIP lounges
Workforce
“Over 2,000 people” (Coral); “over 1,000 workers” (Zee News)
Inaugurated
28 May 2023

In February 2022, Construction World reported that Narsi Group had been selected to complete the loose furniture and interior fit-out of the new Parliament building, working with Tata Projects Limited as project manager and HCP Architects.4 Coral, an Italian industrial equipment maker that published a case study on the group, wrote that the rooms, library and central hall “required a labour of over 2,000 people”.6

When the building opened, Zee News listed the spaces completed by his team — the Constitution Hall, members’ lounges, library, café, dining areas, committee rooms and VIP lounges — and reported his gratitude at being part of a national institution alongside Tata.7

He and Jagdish Kularia described the making of the Parliament interiors in a video interview, available on YouTube.

Other national commissions

Beyond the Parliament

  1. a.

    Bharat Mandapam, Pragati Maidan

    The international exhibition and convention centre in New Delhi, on the ITPO complex. Reports credit Narsi and Jagdish Kularia with interior work there; Narsi Kularia himself cited the Pragati Maidan convention centre among the projects “being built by Indian carpenters”.28

  2. b.

    Vice President Enclave

    Listed among the group’s major projects by the Vishwakarma Shakti Sangh Foundation.5

  3. c.

    Corporate campuses across India

    Pan-India office interiors for technology, banking and consumer companies, as reflected in the client list above.1

Scale, as reported

Figures differ by source and date

Rather than choose one, the table sets out what each source says.

Company figures are self-reported or reported by third parties and have not been independently audited here.
MeasureFigureSource
Projects delivered840+Narsi Group, across over 100 million sq ft
Projects delivered500+Coral case study
Team members4,000+Sangri Today, June 2023
Size of business₹700 crSangri Today, June 2023 (“700 Crores Empire”)
Annual turnover~₹650 crVishwakarma Shakti Sangh Foundation
Parliament workforce2,000+Coral case study
Parliament workforce1,000+Zee News, May 2023

Sources

  1. Sangri Today, profile of Narsiram D Kularia, 3 June 2023. sangritoday.com
  2. ThePrint / ANI, 7 August 2024. theprint.in
  3. Narsi Group, official website and social channels. narsi.in
  4. Construction World, “Narsi Group solidifies its position via milestone Parliament project”, 11 February 2022. constructionworld.in
  5. Vishwakarma Shakti Sangh Foundation, “Icons” profile. vssfoundation.com
  6. Coral, “Narsi Group and Coral’s contribution to Indian architectural excellence”. coral.eu
  7. Zee News (Hindi), 28 May 2023. zeenews.india.com
  8. Skill Reporter, September 2022. skillreporter.com